12-month fixed-price contracts do not work for an SMB. Here is the cadence that does.

Back to articles
Author : Sinclaire Mbounda, Co-CEO·Published on May 25, 2026·5 min read

A FlyTech Inc mission runs in two-week cadences. Monday morning, we scope. Friday of week two, we demo.

Three disciplines fall out of it. First : we cut scope. A sprint is about four serious user stories. Not more. Second : your decision-maker sees progress every two weeks, not every six months. When something drifts, we catch it before iteration three. Third : your internal team can test live and push back.

This avoids the tunnel effect. It also avoids the end-of-mission "big bang" where everyone discovers the spec no longer matches the current need. No 18-month roadmap. A short cadence. A progressive transfer.

Media

Documents and links.

  • Video

    Henrik Kniberg — Agile Product Ownership in a Nutshell

    The reference to visualize what a sprint that holds looks like.

    Open
  • End-of-sprint demo at an SMB client.
    Image

    End-of-sprint demo at an SMB client.

FlyTech Inc team mid-session, section backdrop.
The FlyTech Inc team
Next step

30 minutes.A plan.Or an argued no.

No pitch. No slides. We get your need, we say yes or no, we cost it. You decide.

Book nowor contact@flytech-inc.com